SMD Singapore shifted from Kallang Bahru to Tai Seng on the 6 to 8 June 2008.

Main door

Facing main door.

Admin Office as viewed from the back.

Conference Room.

Carrier tape production. Toolings at far end.

Carrier Tape production QC on the left.

At foreground: Components awaiting kitting. At background: Taping machines.

Packing area. QC is at far end.
0 Comments:
Post a Comment
<< Home